The makeover of Cafe 32 and the development of the Langley Room are progressing well. The new connecting doors have been installed between the two rooms and the decorators are finishing off the fabulous new colour schemes. Then it will be time to refurbish the floor, install the audio-visual along with the new modular furniture – hopefully all in time for May 17th.